FOTOS

BACKGROUND / Digital Direct Control System (DDC)

Johnson & Johnson

LABORATORIOS BERNABO S.A. (Pta. Malvinas Argentinas, Parque Ind. Tortuguitas)

Solid Plant (2014-2015)

Implementation, installation, distribution and programming of Direct Digital Control Systems (DDC) and Central Monitoring of HVAC Systems and Services Plant.

Automation and monitoring Thermomechanical Ventilation and Air Conditioning HVAC. Solid Production Plant.  Approx. 9,000 m2.

Configuration, adjustment and commissioning of the systems.

-

LABORATORIOS ROEMMERS S.A.C.I.F.I.A.

Fractionation Plant, Pharma 2000 (2013) 

Installation of DDC systems and EBI supervision systems for HVAC humidity-controlled and air conditioning systems. Humidity-controlled fractionation plant, Pharma 2000 (Mataderos). 

Installation setup and startup.

Sampling Plant (2009) 

Project design and installation of DDC systems for HVAC humidity-controlled and air conditioning systems. Luis Guillón Plant.

Installation setup and startup.

Johnson & Johnson

JOHNSON & JOHNSON de Argentina S.A.

 

Liquids Processing Plant (2014-2015)

 

Project and implementation of Direct Digital Control Systems (DDC) for Thermomechanical HVAC Systems and Plant Services.

 

Facilities and HVAC Systems, Mechanical Ventilation, Alcohol Withdrawal Systems and Control Systems DDC.

System setup, adjusting and startup.

Starch Production Facility (2013-2014) 

DDC Systems for HVAC plant services and thermo-mechanical systems.

Installation of HVAC systems, mechanical ventilation and dust extraction systems, and DDC Systems, with humidity control (30 to 55% RH).

System setup, adjusting and startup.

Sanitary Protection Facility - SanPro (2014)

Project design and installation of DDC systems for HVAC equipments.

Facility startup, testing, adjusting and balancing (TAB).

-

S.A. LA SIBILA (Nogoyá – Entre Rios Province)

Alimentos Fray Bentos (AFB) Plant Project Design – Uruguay (2013)

Project design and installation of DDC systems and central plant monitoring and supervision systems for HVAC equipments, mechanical ventilation and special extraction systems, chilled-water, hot-water and steam systems, and electrical systems.

Milk Fractionation, Production and Bottling Facility (2013)

Per agreement with ROEMMERS SAICF.

Control systems for HVAC plant services and thermo-mechanical installations.
Installation of HVAC system, mechanical ventilation and special extraction systems, chilled-water, hot-water and steam systems, and electrical systems.

System setup, adjusting and startup.

-

LABORATORIOS ZELLTEK S.A. (Santa Fe Province)

EBI Safety Management System Implementation (2011-2012)

Software and license supply of Honeywell EBI safety and control system, programming and adaptation, new control stations and connection to DDC system. In compliance with 21CFR Part II Regulations, with final system validation and certification and IQ PQ OQ Protocols.

Single-product Cell Culture Production Plant (2008-2009)

Project design and installation of DDC system and supervision of biotech cell culture production plant (ABI).

Monitoring and supervision of thermo-mechanical systems, general plant services and special plant services.

Installation of HVAC systems, mechanical ventilation and special extraction systems, chilled-water and steam systems, automatic transference switch, transformer substation and genset.

Heated and refrigerated soft process water systems, PW and WFI plants, clean steam, special gases –O2, N2, CO2, He-, pharmaceutical compressed air, cold rooms, etc.

Setup and startup.

-

GEMA Biotech S.A.

Biotechnology Pilot Plant, Phases I, II and III (2005-2007)

Project design and installation of DDC system for HVAC air treatment systems and biotech cell culture plant utilities. Olivos Plant, 5th floor, ROEMMERS SACIF building.
-

ERIOCHEM S.A.

SZ Plant Project – Uruguay (2013-2014)

Project design and installation of DDC systems and central plant monitoring and supervision systems for HVAC equipments, mechanical ventilation and special extraction systems, chilled-water, hot-water and steam systems, and electrical systems.

Lyophilized Products Manufacturing Plant - Paraná (2013)

DDC Systems and central monitoring and supervision systems for thermo-mechanical system plant services for HVAC equipments.

Installation of HVAC system, mechanical ventilation and special extraction systems, chilled-water, hot-water and steam systems, and electrical systems.

System setup, adjusting and startup.

-

LABORATORIOS POEN S.A.C.I.F.I.

Ophthalmic Products Manufacturing Plant (1998)

Project design and installation of centralized monitoring, supervision and command system for HVAC equipments and plant services (air conditioning, steam, compressed air, transformer station, etc). Setup and adjusting.

Ophthalmic Products Plant – DDC System Extension (2002)

Extension of plant control system, incorporating new network control modules and field sensors for parameter recording and monitoring at various area spots. Differentiated variable control system for each area (Temperature, relative humidity, static pressure).

(1998 to 2004) Preventive Maintenance Services for DCC systems, according to preset plans and procedures. Instrument and equipment verification and control.

-

GIVAUDAN Argentina S.A.

MSD Spray-dryer Facility (2013)

DDC Systems for HVAC plant services and thermo-mechanical systems.

Installation of HVAC air conditioning system, mechanical ventilation and special extraction systems, chilled-water, hot-water and steam systems, and electrical systems.

System setup, adjusting and startup.

Gramon

LABORATORIO GRAMON

Semisolid and Liquid Products Plants / Aseptic Area (2013)

Control systems for HVAC thermo-mechanical systems.

Installation of HVAC system, mechanical ventilation and special extraction systems, and electrical systems.

System setup, adjusting and startup.

-

LABORATORIOS NORTHIA S.A. (Project Quirón - Pilar)

Lyophilized Oncology Products Manufacturing Plant (2010-2011)

Project design and installation of DDC system and central plant monitoring and supervision system.

Control systems and monitoring and supervision systems for HVAC plant services and thermo-mechanical systems.

Installation of HVAC system, mechanical ventilation and special extraction systems, chilled-water, hot-water and steam systems, and electrical systems.

System setup, adjusting and startup.

Beta-lactam Products (syrup and powder form), Preparations, Penicillin Products and Injectables Plant (2001-2007)

Project design and installation of centralized DDC system for mechanical ventilation and extraction systems, and air conditioning and heating systems at various manufacturing plants. Setup and adjusting.

(2001 to 2010) Preventive Maintenance Services for DCC systems, according to preset plans and procedures. Instrument and equipment verification and control.

-

MEGA-Pharma S.A. (Montevideo – Uruguay)

Biotechnology Plant (2005)

Project design of DDC system for HVAC air treatment systems and biotech cell culture plant utilities.

Technical Specifications Manual (2006)

Development of Technical Specifications Manual for the construction and/or remodeling of pharmaceutical plants for Grupo Mega-Pharma manufacturing plants.

-

KEMEX Laboratorios S.A.

Lyophilized Oncology Products Manufacturing Plant (2006)

Project design of DDC systems for HVAC air treatment systems and complementary general plant services for lyophilized oncology products manufacturing and dosing plant. Class 100 laminar flow areas and class 10.000 (ISO 5 and 7 - Grades A, B and C) areas.

Lyophilized Oncology Products Manufacturing Plant (2007)

Installation of DDC system for HVAC, ventilation and extraction installations at lyophilized products manufacturing plant. Setup and adjusting.

-

FARMACEUTICA PARAGUAYA S.A. (Asunsión - Paraguay)

Aseptic Area and Labs (2004)

Project design of DDC system for HVAC air treatment systems for sterile-liquid manufacturing and filling plant (first floor).

-

LABORATORIOS KLONAL S.R.L.

Beta-lactam Products (Syrup and Powder Form) Manufacturing Plant (2001-2003)

Project design and installation of centralized DDC system for all HVAC equipments in the building. Setup and adjusting.

-

G & M S.A. (Laboratorio ELEA S.A.C.I.F. y A.)

Powder Manufacturing Area (2003)

Project design and installation of DDC system for temperature-controlled and humidity-controlled plant. Setup and adjusting.

Powder Manufacturing Area – DDC System Extension (2011)

Extension of manufacturing control system, incorporating new field sensors for parameter recording and monitoring at various area spots. (temperature and relative humidity).

-

LABORATORIOS FABRA S.R.L.

Humidity-controlled System, Cytostatic Solids Aseptic Area, C. Villate Plant (2001) (2001)

Project design and installation of DDC system for humidity control, chilled-water system, dehumidifier and air treatment units for solid products manufacturing area.